Zhejiang Architecture,第31卷,第4期,2014年4月,Zhej Ang Construction,VO1。 3 1, No. 4, Apr. 2014 Replacement calculation and construction of cast-in-place box beam foundation of the 2014 Full-town bracket method Ground Replaceme nt C a lc ultom and C o struction fo r C ast--in--plac e Box Beam w ith F ull S upport Weipeng WEIP eng (China Railway 16th Bureau Group Third Engineering Co., Ltd., Huzhou 313000, Zhejiang)摘要:全镇支架是用于现场梁板的通用支撑系统。在施工过程中,支持基础的稳定性与整个支持系统的安全有关。当基础轴承能力不足或地质条件不足时,需要基础治疗。在基础承载力满足设计要求之前,无法架设支持。现在,通过在使用Jiashao Cross-River Bridge Soush Connection Line Project Project Center River Bridge的现场式盒装围栏时的全塔支架基金会的处理,当使用替换方法时,相关的计算和构造技术方法可以用作将来相似工程建筑的参考。关键字:全厅支架;基础;补充处理分类编号:T U473。 2 Document logo code: B Article number: 1008 —3707 (2014) 04 —0016 — 04 1 Project overview The superstructure of Piers No. 1 to 4 of the Jiashao Cross-river Bridge South Connection Line Center River Bridge Project is designed as a single box double-chamber cast-in-place continuous box girder with a box girder bridge width of 20. 25 m, bottom plate width 12. 75 m, web thickness 0. 5 m,梁高2。5 m,单孔束长36。5m,桥约为11. 2 m。
中央河桥位于上海城的利海镇。该遗址属于Qiantang River南岸的冲积平原地区。大多数桥梁是农田,湿地和虾池塘。现场盒子梁的位置最初是农田。地层的浅层土壤主要是纯净的土壤和淤泥土壤,表面层的分布层为0。3~0。 5 m,具有较大的天然水分含量kaiyun全站网页版登录,在某些地区的小坑洼和水积聚,并且底漆容量较低。根据施工图,表1显示了地层的地质盒梁从上到下的地质条件分布以及地层的主要物理和机械参数。从经济利益的角度来看,项目部决定使用碗式钢管来架设全室支架方法倒入盒子梁。由于较浅的地质条件,为了避免轴承能力不足,在施工过程中的基础中过度定居或剪切破坏,从而导致支架的过度沉降或不均匀的沉降,从而导致梁的混凝土不稳定甚至是破裂的,甚至需要将基础置于托架表1层分层的范围内云开·全站体育app登录,需要进行2次地质和机械范围的范围。基础治疗方案的比较(1)直接压实:梁位置的表面土壤是普通的土壤,其天然水分含量很高。如果使用辊将其直接滚动,则土壤层将是柔软和塑料的,并且无法满足地基轴承能力,也不能用作支架基础。
此方法不可行。 (2)填充和缓冲方法:表土的厚度约为300至500毫米,厚度很小。下层是粘性淤泥土壤,基本轴承能力为100 kPa,相对较好。可以将基于表面的填充土壤挖掘到粘合的淤泥层,然后用高强度,低压和稳定的性能代替。收到的日期:2013年-12 - 30作者资料:Wei Peng(1982)Male,来自Huzhou开yun体育app官网网页登录入口,Zhejiang,工程师,从事土木工程桥和隧道工作。